Office Gallery

Project 8

LOS ANGELES — These offices / studios were having leak problems and heat build up inside this old building. The majority of leaking was around reinforcing wall brackets which tend to have tar used as sealants which dry out quickly on stress points such as these. On brackets we use a very flexible white rubber which greatly out lasts tar and holds up well to building movement. The roof was thoroughly washed and 3 roof coatings where applied with the top coats being an elastomeric roof coating. Roof leaks were resolved and the interior heat problem was significantly reduced.

Call us today to get a free quote!

(855) 248-5968

Get a Free Quote Today